Endurance testing
Engines are run under load so that starting behaviour, cooling and stability can be checked over a longer running period.
Manufacturing base / 01
The production figures buyers usually ask for before requesting a factory audit or a quotation.
| Factory area | 15,000 sqm |
|---|---|
| Workforce | 90 people |
| Production lines | 4 lines |
| Annual capacity | 300,000 units |
| Product scope | Gasoline chain saws, brush cutters, earth augers, water pumps and spare parts |
| Location | Wuyi County, Jinhua City, Zhejiang Province, China |
Testing / 02
Performance testing is part of production quality control, not an optional extra.
Engines are run under load so that starting behaviour, cooling and stability can be checked over a longer running period.
Output power is measured against the specification of the model, so the delivered machine matches the quoted performance.
Quality and certification documents that apply to your order are shared with buyers on request.
Certification / 03
Compliance requirements differ by market. Tell us the destination country and the model list and we confirm which documents apply to your order.
| ISO 9001 | Certified. Certificate file available and shared with buyers on request. |
|---|---|
| CE | Confirmed with your enquiry. Tell us the models and the destination market, and we confirm which CE documentation applies to them. |
| Market requirements | Import regulations vary by country; destination-specific documents are confirmed per order. |
Track record / 04
An example of long-running supply rather than a one-off trial order.
| Market | Russia |
|---|---|
| Buyer | A garden machinery importer in Russia |
| Products | Gasoline chain saws and brush cutters |
| Volume | Approximately 6,000 units per year |
Start / 05
Tell WEIDUN your destination market, product categories and expected volume; the relevant quality and compliance documents follow with the reply.